What to Expect During Your Cabinet Painting Project

January 22, 2024

Not knowing what a cabinet painting project actually involves day-to-day can make it feel like a bigger disruption than it needs to be. Here's exactly how a professional project typically unfolds.

Step 1: In-Person Estimate — Counting doors/drawers, assessing finish, discussing colors, providing an itemized quote.
Step 2: Removing Doors and Drawer Fronts — Labeled so each returns to its exact original spot.
Step 3: Cleaning and Degreasing — Removes kitchen residue that would prevent adhesion.
Step 4: Sanding and Deglossing — Creates a surface paint can bond to.
Step 5: Filling and Repairing — Dents and gaps filled smooth.
Step 6: Priming — Bonding primer creates the foundation for the topcoat.
Step 7: Painting — Doors sprayed in a controlled area; boxes painted in place, multiple coats.
Step 8: Reinstallation — Doors rehung, hinges adjusted, hardware reinstalled.
Step 9: Final Walkthrough — Checking doors close properly and finish meets expectations.

How Long Does It Take?
Most full-kitchen projects take several days to a week or more, largely due to dry and cure time between coats — rushing leads to sticking and durability issues.

Living Without Your Kitchen During the Project
Countertops, appliances, and plumbing stay untouched, but expect limited cabinet storage access while doors are removed — plan a temporary alternative for daily essentials.

What Happens to Countertops and Appliances
They typically get covered with protective sheeting during spraying near the cabinet boxes.

How to Prepare Before the Crew Arrives
Clearing cabinet contents ahead of time speeds up removal, and setting up a temporary spot for daily essentials makes the week more manageable.

Coordinating With Other Kitchen Updates
Cabinet painting typically makes sense before or after countertop/backsplash/flooring projects, not during, to avoid overspray or damage.

What a Typical Day Looks Like Mid-Project
Crews work primarily on doors in a separate spray area while touching up boxes on the wall — kitchen may look partially finished for several days.

How Humidity Can Affect the Indoor Timeline
Unusually high humidity can slow cure time between coats, occasionally adding a day to the schedule.

What to Ask If the Project Runs Long
Legitimate reasons include discovered damage or humidity; vague explanations are worth following up on.

Getting Everything Back in Place
Final reinstallation includes hinge alignment and hardware — the difference between technically finished and genuinely looking like new.

Know exactly what to expect before your project starts. Our process is transparent from the first estimate through the final walkthrough, with a realistic timeline based on your kitchen's actual size and condition. Get your free cabinet painting estimate and see exactly what to expect.